Get in Touch with Masstech

Contact Form 使用中

Capacity Tier Selector — 2-Minute Quiz

Capacity Tier Selector — 2-Minute Quiz

Tell us three things about your planned line. We’ll return the Mass Tier (1 Craft / 2 Mid-Volume / 3 Industrial), indicative lead time from PO to commissioning, and which Mass product page covers your application.

If you only know bottles per day, divide by 8 (single-shift) or 16 (two-shift)
Tier 2

Mid-Volume Production Line

Your specifications align with Mass’s mid-volume tier — engineered for regional beverage producers stepping up from craft scale.

Capacity Class
6,000–18,000 BPH
Lead Time (PO → commissioning)
75–105 days
Best-Fit Mass Line
Water + Multi-Liquid Swap