Get in Touch with Masstech
True Landed Cost Estimator — Beyond the FOB Quote
Industry data shows real installs run 40–80% above the bare equipment quote. This calculator estimates the six hidden cost dimensions Mass quotes against, based on Solon Consulting’s 2025 brewery automation analysis (consultsolon.com).
Cost Breakdown — 7 Components
FOB Equipment Quote
—
Sea Freight + Insurance —
—
Customs & Import Duties —
—
Electrical & Utilities Upgrade —
—
Integration & Civil Work —
—
Validation, FAT/SAT, Commissioning ~5%
—
Operator Training + 1st-Year Spare Kit ~3%
—
Estimated Total Landed Cost
—
Surcharge over FOB
—
—
Mass publishes this estimator because the gap between quote and reality is the #1 brewery procurement complaint. Our written quote breaks out the same dimensions for full transparency.
Estimate model — Mass uses industry-typical multipliers calibrated against the Solon Consulting 2025 dataset, Craft Beer Institute hidden-cost webinars, and Mass field deployments. Real numbers depend on your specific port, local labor rates, regulatory regime, and the scope of your existing utilities. Final landed-cost figures require an engineer-reviewed site survey. This calculator is for budget orientation only.



